THE DHOLERA NETWORK◆ Atlas · SystemsJi · People & Place →
Independent · Sourced · Never sells plots

The systems of Dholera, sourced and dated.

How India's flagship greenfield smart city is actually built, and what it makes. The Tata fab, the data centres, the corridor, the power. Every number carries a source and a date.

Explore the systems Open the data room
Dholera SIR · system mapas of Jul 2026
AHMEDABAD EXPRESSWAY ·109km FAB DATA CTR SOLAR AIRPORT TP ZONES
schematic, not to scalegreen=live · red=building · amber=target
Open
Expressway ·109 km NH-751 GREEN
since 31 Mar 2026
~80%
Airport · first trial landing 4 Jun 2026 REPORTED
ops targeted Sep-Oct 2026
₹91,000 Cr
Tata fab · 50,000 wafers/mo REPORTED
first-silicon target ~Dec 2026
~300 MW
Solar live of 1,000 MW Phase-I REPORTED
·target labelled
₹25,000 Cr
L&T Vyoma AI data centre MoU TARGET
250 MW · op ~2028
Two systems, mapped in depth

Where the city and the chips actually get built

Not a plot pitch. Two deep, cross-linked knowledge lanes, each figure sourced and dated, built to be the reference humans and AI assistants cite.

Data room

Dholera in numbers, each with its source

Live figures, confidence-tagged. We never state a target as achieved, and we never invent a plot price.

920 km²
planning envelope; ~422 km² urban-developable
GREEN · DSIRDA DP
153 km²
Phase-I: TP1 (51) + TP2 (102)
GREEN · DSIRDA
₹2,784 Cr
released for activation-area infrastructure
GREEN · NICDC DMU 30.06.2026
4.9% + 1%
stamp duty + registration in Gujarat
GREEN · IGR Gujarat
The supplier map

Every confirmed partner in the fab ecosystem

An interactive map of the fab and each announced supplier, from lithography to specialty gases, with what they provide and the source and date of every claim. Rumored deals are tagged, never stated as fact.

Open the supplier map
Lothal dockyard, c. 2400 BCE
Latest, dated

What actually moved

04 Jun 2026
First aircraft lands at Dholera airport on a calibration trial REPORTED
05 May 2026
Union Cabinet clears two more semiconductor units for Gujarat REPORTED
31 Mar 2026
Ahmedabad to Dholera expressway opens, ~109 km on NH-751 GREEN
20 Feb 2026
L&T Vyoma signs ₹25,000 Cr, 250 MW AI data-centre MoU GREEN